ISO 9001 certified manufacturer · Shenzhen, China

Technical library

Datasheets, installation manuals, declarations of conformity, layout drawings and engineering white papers. Open documents download immediately — gated documents ask for a business email so we can send updated revisions.

PDF

HP33 Modular UPS — Technical Datasheet

Full electrical, mechanical and compliance data for the 10–600 kVA modular UPS platform, including module sizing tables and battery runtime curves.

Datasheets EN 2.4 MB
Download 10 downloads
PDF

HP11 Tower UPS — Technical Datasheet

Specifications for the 1–20 kVA online tower UPS: input window, runtime tables, rack formats and optional SNMP card.

Datasheets EN 1.6 MB
Download 6 downloads
PDF

AquaRow IRC — In-row DX Cooling Datasheet

Capacity tables at 24 °C / 35 °C return, airflow, refrigerant options and dimensional drawings for the in-row DX range.

Datasheets EN 3.0 MB
Download 6 downloads
PDF

MicroCube MD — Micro-modular Pod Datasheet

Pod configurations from 4 to 12 racks, power and cooling options, containment layout and site preparation requirements.

Datasheets EN 4.2 MB Registration required
Business email required
PDF

CubeDC 40 ft — Containerized Data Center Datasheet

Up to 1.2 MW per pod: enclosure construction, cooling architecture, UPS sizing, transport and lifting data.

Datasheets EN 5.1 MB Registration required
Business email required
PDF

LiquidCube CDU — Containerized Coolant Distribution Datasheet

Hydraulic schematics, pump curves, secondary loop temperatures and heat-reuse interface for the 0.5–2 MW CDU container.

Datasheets EN 4.8 MB Registration required
Business email required
PDF

Data Center Cooling Architecture Guide

A 32-page engineering guide comparing room, row, rack and liquid cooling across density bands, with PUE modelling for five climate zones.

White papers EN 8.7 MB Registration required
Business email required
PDF

Liquid Cooling for AI Clusters — White Paper

Why 40 kW racks break air cooling, how direct-to-chip and immersion compare, and what infrastructure a GPU cluster actually needs.

White papers EN 6.3 MB Registration required
Business email required
PDF

Micro-modular Deployment Checklist

Site readiness checklist for micro-modular pods: slab, power, network, fire, access and commissioning sign-off.

Manuals EN 1.0 MB
Download 7 downloads
PDF

UPS Installation & Commissioning Manual

Mechanical and electrical installation procedure, battery cabinet wiring, commissioning tests and first-year maintenance schedule.

Manuals EN 10.9 MB Registration required
Business email required
PDF

ISO 9001 : 2015 Quality Management Certificate

Current certificate covering design, manufacture and service of power and cooling equipment.

Certificates EN 0.6 MB
Download 6 downloads
PDF

CE Declaration of Conformity — UPS Range

CE declaration covering the HP11 and HP33 UPS ranges against IEC 62040 and the EMC directive.

Certificates EN 0.5 MB
Download 6 downloads
PDF

Typical Container Layout — 40 ft, 24 Racks

Layout drawing (DWG/PDF) showing rack positions, aisle containment, cooling units and cable entry for the 40 ft pod.

Drawings EN 1.4 MB Registration required
Business email required
Revision control. All documents carry a revision number and issue date on the cover. Datasheets are updated when specifications change — if you need the latest revision for a tender, ask us and we will confirm in writing.

Specification help

Can’t find the document you need?

Site-specific drawings, country-specific certification and translated manuals are available on request.

Request documentation